Illustrative example — not a live site or completed client project

What a screening can look like

A readable working product: the buyer’s question, what the evidence can support, open questions and a recommended decision. No municipalities, properties or capacity figures here are real.

Illustrative deliverable · version A

Illustrative screening file

Decision

Buyer question: Is the available evidence enough to decide on a bounded further study — or should the work stop here?

Work done

A synthetic desktop pass keeps location, planning, grid and surroundings separate. It covers only the structure of this illustrative file.

Document date
11 September 2026 — illustrative version date.
Review scope
Synthetic qualitative desktop structure — not a review of a real location.

Observations

The observations below show source, date and review scope. They describe what is in the file, not an outcome for a real location.

  • The buyer’s own location description (stated).
  • A reference to a municipal paper that has not yet been read.
  • No grid, environmental or title paper in the file.

Dimensions

Illustrative table of dimensions, sources and review scope.
DimensionEvidence stateSourceDateReview scopeFinding
Land and controlStatedBuyer location description11 September 2026Desktop structureBoundary and title are not evidenced in this file.
Planning routeDocument named, not reviewedBuyer reference11 September 2026Desktop structureA municipal paper is mentioned. Whether it is an early note, a planning opinion or a later decision is not settled.
GridMissingNo grid evidence in the file11 September 2026Desktop structureNo written grid contact is included. A regional map is not a connection statement.
Environment and surroundingsNot assessedNo specialist evidence in the file11 September 2026Desktop structureNo specialist study is in scope for this desktop pass.

Assessment

Assessment: the file is enough to organise known facts and show the gaps. It is not enough to say the place is feasible, connectable or approved in planning.

Open questions

Illustrative register of open questions and proposed actions.
QuestionEvidenceWhy it mattersProposed actionRole
Which part of the land is in scope?A rough description.Area and constraints are still open.Confirm the boundary. A point is not a cadastral line.Buyer
Which stage does the municipal paper describe?Document named, not read.An early note must not be read as a later permit.Review the paper and record what it actually means.Planning
Is there any grid contact?No paper in the file.The power question is unknown — not zero and not available.Collect requirements and ask for the right technical input.Coordination + grid specialist

Recommendation

Commission a bounded review of the named planning paper and confirm the land boundary before any grid or design work starts. The conclusion is not that the site is feasible.

How the next evidence can change the decision

The following are two synthetic continuations of the example. They show how the same question can lead to different work as the evidence changes.

A. The planning boundary covers only part of the proposed area

New evidence
A hypothetical review finds that the site sketch and named planning document cover different areas.
Implication
The larger area cannot be described using planning evidence for the smaller one. The expansion proposal also needs its own check.
Action and role
The buyer confirms the project boundary. The planning lead separates the area covered by the document from the area whose planning position remains unknown.
Recommended decision
Redefine the review scope before drawing an overall conclusion about the location.

B. The boundary is confirmed, but the grid question remains open

New evidence
In this hypothetical continuation, the site sketch can be matched to the correct planning document. Load definitions and project phases are still missing.
Implication
Clearer planning evidence does not establish the project's power need or the connection it could obtain.
Action and role
The project team completes the brief, separating IT load, facility load and connection need. A site-specific grid question can then be prepared.
Recommended decision
Continue with a defined requirements and grid question, recording planning and connection work separately.

Prepare the project requirements brief →

Next steps

  1. Confirm the land boundary and the stated control.
  2. Obtain and review the named planning paper.
  3. Define the grid question and the specialist input it needs.
  4. Decide whether to commission that bounded review.

Options

  • Proceed with a bounded document review.
  • Clarify the brief before further work.
  • Pause or stop this line of work.

Assumptions and limits

  • Desktop pass. No site visit is included.
  • Unknown facts stay unknown.
  • The example is synthetic and qualitative. It is not a live land listing.

The illustrative label stays with the page. This example never becomes a real land listing in a register, map or structured data.